Civil & Electrical
Engineering Contractors
Our Services
Works Completed
King Charles III Coronation
On 6th May 2023 King Charles III coronation ceremony took place
at Westminster Abbey, London. The coronation reflects the monarchs role today and look towards the future.
Working alongside a valued client, Briant Traffic played an essential role in Ceremony preparations. Preparing the parade
route by removing Traffic Signal equipment ready for the big ceremony day.
Find out about our ITS works here.
Silvertown Tunnel
This new 1.4km tunnel will bore under the thames linking Greenwich Peninsula with Silvertown. The tunnel is being built to help ease congestion at the currently used Blackwall Tunnel. The
project aim for completion is 2025.
Briant Traffic have carried out Traffic signal upgrade works on this scheme. Working under our client we have provided multiple Loop cutting programmes and also Traffic signal upgrade
Schemes working to high Health & Safety standards and strict deadlines, Briant Traffic always manage to deliver.
Find out more about our detection works here
Battersea Power Station
Briant Traffic were contracted by Battersea power station to carry out the Civil & Electrical installation of a Traffic signal junction. The Junction was to be used to enable construction works safe access & egress to their work areas whilst maintaining regular road transport services such as deliveries.
Completing the works 10 days ahead of proposed schedule, Briant Traffic completed this scheme from site design, consultancy right through to installation and commission.
Another major landmark project for Briant Traffic.
Click here to find out more about our civil engineering.